
- Project Name TRG Lighting
- Client TRG
- Date November 2021
- Duration 1 month
- Location Adelaide
Project Summery
TRG lay down yard, from temporary lighting to 4x 600w and 8x200w floods lighting up different aspect ratios of their yard from 10m high controlled by a sunset switch.
TRG had serious issues due to poor lighting in their rear service yard. Existing 15m light poles with 1x 400w Metal halide were not even remotely adequate. Bring in altered cross arms with 2x 600w floods and 2x 200w floods this area is now lit like Willie Nelson. Fair to say TRG loved the outcome